J Spring
The vessel was loaded with 3000 cubic meters of sawn timber in Surabaya Port and is now sailing to Gunung Sitoli. The timber belongs to UNHCR and will be used for the reconstruction process on Nias Island. ETA at Gunung Sitoli Port noon time on 15 March 2006.